国精品无码一区二区三区左线亚洲最新无码成av人_国产三级自拍欧美亚洲性爱_无码免费中文字幕a级毛片_精品久久久久午夜福利_好紧我太爽了视频免费国产_国产国语刺激对白毛片l_吃奶的中文字幕色妞网_五月婷婷六月丁香综合激情_亚洲欧美日韩精品自拍偷拍_亚洲春色中文字幕

NEWS

Repair and maintenance of vertical laminating machine

Date:2016-11-12    Font size:Big  Medium  Small

Vertical laminating machine repair and maintenance of the laminating machine is the main part of the heating aluminum plate, the original station, hydraulic cylinder, distribution box, etc.

1 After the heating plate is broken, the temperature does not rise (or the temperature rises very slowly) (normal temperature rises for half an hour) that is the heating tube is broken, remove the screw of the square tube and replace the heating tube on it (heating tube 220 electricity)

2. The original station is to control the lifting of the cylinder, so it is very important to fill the vertical laminating machine with a little oil (Great Wall Zhuo Li hydraulic oil), and the working time can not exceed 10 hours after the overtime will damage the machine, change the hydraulic oil once a year.

3. The hydraulic cylinder should not be too hot as it will slowly leak oil, so the working time should not exceed 10 hours.

The distribution box is composed of rotary switch indicator light, temperature control, voltmeter, time relay and button. If any part is not working, replace it immediately.

5 high temperature paper with material baked, stick to the high temperature paper with water cloth can be wiped.

Bake material is more than the replacement of high temperature paper must be used before the replacement of vertical laminating machine yarn paper to wipe the black residue to towel paste.



HOME

PRODUCTS

INQUIRY

CONTACT US